Project Finance: CFADS, Debt and Equity IRR
Finance a project from the ground up. Fund a two-year build with debt and equity, accrue and capitalize interest during construction, and carry the loan to commercial operations. Then build CFADS, sculpt principal so every year hits the target DSCR, pay the residual to equity, and finish on the equity cash flows, equity IRR and equity multiple. Every line must be linked, not pasted.
IB · Advanced · about 100 minutes · 20 guided steps
Lesson outline
Construction Funding
- Step 1: Construction Debt Draws
- Step 2: Construction Equity Draws
- Step 3: Total Construction Cost
Interest During Construction
- Step 4: Cumulative Debt Drawn
- Step 5: Interest During Construction
- Step 6: Total Interest During Construction
- Step 7: Debt at COD
Operations and CFADS
- Step 8: EBITDA
- Step 9: CFADS
Debt Sculpting
- Step 10: Beginning Debt
- Step 11: Interest
- Step 12: Principal Repayment
- Step 13: Debt Service
- Step 14: Ending Debt
- Step 15: DSCR
- Step 16: Equity Distribution
- Step 17: Minimum DSCR
Equity Returns
- Step 18: Equity Cash Flows
- Step 19: Equity IRR
- Step 20: Equity Multiple