Ground-Up Development
Model an S-curve construction draw schedule with capitalized interest, defend the stabilized NOI from its leasing drivers, value the finished asset, then refinance the construction loan with a permanent takeout and solve for yield-on-cost, development profit, equity multiple and levered development IRR. Every line must be linked, not pasted.
REPE · Advanced · about 95 minutes · 26 guided steps
Lesson outline
Capitalization
- Step 1: Cost Basis
- Step 2: Construction Loan
- Step 3: Developer Equity
Construction Schedule
- Step 4: Total Draw $
- Step 5: Loan Draw $
- Step 6: Equity Draw $
- Step 7: Loan: Opening Balance
- Step 8: Loan: Capitalized Interest
- Step 9: Loan: Ending Balance
Stabilized NOI Build
- Step 10: Potential Gross Rent
- Step 11: Effective Gross Income
- Step 12: Operating Expenses
- Step 13: Stabilized NOI
Stabilization & Profit
- Step 14: Total Capitalized Interest
- Step 15: Total Development Cost
- Step 16: Stabilized Value
- Step 17: Yield on Cost
- Step 18: Development Profit
- Step 19: Profit Margin on Cost
Permanent Loan Takeout
- Step 20: Permanent (Takeout) Loan
- Step 21: Construction Loan Payoff
- Step 22: Net Refinance Proceeds
- Step 23: Residual Equity Value
Equity Returns
- Step 24: Equity Cash Flow
- Step 25: Equity Multiple
- Step 26: Levered Development IRR